Colusa Hall Remodel Project

  • This project covered the coordination infrastructure, cabling & electronic needs in support of the remodel of Colusa Hall. Communications Services provided specifications and design review, inspection during construction, and post move support.

Outdoor Wireless Project

  • This project added outdoor wireless to the areas around the Wildcat Rec Center, Merriam Library, Student Services Plaza and Trinity Commons.

Sutter Hall Construction Project

  • This project covered the coordination of infrastructure, cabling & electronics needs in support of the new Sutter Hall Complex. Communications Services provided specifications and design review, inspection during construction, and coordination with vendors & service providers (AT&T and Comcast).

University Farm Mesh Radio Upgrades

  • This project added a Mesh radio system to the University farm, enabling new network connections at several buildings. The Dairy and Meat lab are short range connections, the mesh point at the LIDAR trailer is almost a mile from the center of the mesh.

University village Infrastructure Upgrades

  • Prior to this project, University village was served by 467 individual DSL lines. This project added a microwave link from the campus, underground distribution in the UV complex, electronics at each building, wireless service for all the residents and safety cameras for each building.

Whitney Hall Network Upgrade

  • This project was to design and install infrastructure, build out eight new telecom rooms, and install cabling & network electronics on floors 2-9. This project enabled wireless coverage for all the residential users, and provided support for future safety cameras and fire alarm systems.

2009-2010 Completed Projects

Gateway Science Museum

  • This project covered the coordination of infrastructure, cabling & electronics needs in support of the new Gateway Science Museum. Communications Services provided specifications and design review, inspection during construction, and coordination with vendors & service providers.

New Telecom Room - MLIB 143A

  • This project covered design, inspection, construction and implementation of a new telecom facility on the East side to the first floor of Merriam Library. This new room replaced a small shared room previously used for telecommunications, and enabled modern cabling and network speeds for the East 1st Floor.

West Stadium Restroom

  • This project was to design and install infrastructure, cabling, and a new emergency phone for the new stadium restroom building.

Wildcat Recreation Center

  • This project covered the coordination of infrastructure, cabling & electronics needs in support of the new Wildcat Recreation Center. Communications Services provided specifications and design review, inspection during construction, and coordination with vendors & service providers.

2008-2009 Completed Projects

Campus Wireless

  • This project installed several hundred access points, and new back end hardware to upgrade wireless service in State Buildings to the new campus standard.

Foundation wireless

  • This project upgraded wireless service in Foundation buildings (25 Main St, 35 Main St, and the BMU) to the campus standard.

University Farm Radio Upgrade

  • This project upgraded the Microwave radio serving the University Farm from 10Mb to 100Mb.

2007-2008 Completed Projects

Student Services Center

  • This project covered the coordination of infrastructure, cabling & electronics needs in support of the new Student Services Center. Communications Services provided specifications and design review, inspection during construction, and coordination within vendors & service providers.