The topic
in week 15 is Stack Molds (Chap 15) and Materials (Chap 16)
Monday - The sylabus and class
schedule
and presentation is available in the _Lectures folder in Room 438
Papers
– Literature review #1 - Sept 16
– Literature review #2 - Oct 7
– SolidWorks Design and MF Analysis #1 -
Oct
4
– SolidWorks Design and MF Analysis #2 Plus
Rapid
Prototype- Nov 4
Tooling
Projects
– Mini Mold: Due Oct 18
– Multi-Cavity Group: Due Dec 2
Labs in Notebook
– Lab 1: 5-S: Due Sept 13
– Lab 2: Tooling: Due Sept 13
– Lab 3: Project Management: Due Sept 20
– Lab 4: SolidWorks Part: Due Sept 27
– Lab 5: Moldflow: Due Oct 4
– Lab 6: Mini-mold Machining: Due Oct 11
– Lab 7: Mini-mold Complete: Due Oct 18
– Lab 8: Injection Molding on Battenfeld:
Due
Oct 25
– Lab 9: Multicavity mold Machining: Due
Nov
5
|