Have a question about the new building? E-mail Matt Thomas (mothomas@csuchico.edu) your questions, and we'll keep adding to the FAQs.
Looking for a specific topic without scrolling? On your keyboard, press and hold "Ctrl", and then press "F" and you will be able to find a keyword using this feature.
Move Timeline:
May – building complete
June – CMT sets up classroom technology, and KI installs office furniture
July – Moving and ITSS installation occurs
Final steps – Steelcase installs classroom/conference room furniture
Faculty offices will have the following:
Faculty pods will have multiple workstations, and we are investigating if there is a lockable space for each pod
They will look very similar to the offices in the new Science Building. We have reached out to that college to arrange times when Butte employees can see a Science Building office.
RENDERINGS: https://csuchico.box.com/s/gts0cqjueqrhvz98grtzypvqcz3zkb6h
Your desktop computer, monitor, keyboard, and mouse will be moved by ITSS during July. If you use a docking station for a laptop, that will be moved.
Each office will be issued twelve (12) boxes with lids. The movers will transport those boxes (which need to be taped closed) to your new office. The boxes will measure 15” x 12” x 10”.
On the First Floor (PDF):
1 Geography Lab (30)
1 Seminar Room (22)
3 Small Classrooms (30, 30, 30)
1 Medium Classroom (38)
3 Large Classrooms (48, 48, 49)
1 Active Learning Hall (Jumbo Classroom)
On the Second Floor (PDF):
1 Computer Lab (24)
1 Moot Court Classroom (45)
1 Seminar Room (16)
1 Service Learning Project Room (20)
2 Small Classrooms (44, 30)
3 Medium Classrooms (38, 38, 38)
4 Enhanced Distance Learning Classrooms (38, 43, 38, 18)
On the Third Floor (PDF):
1 GIS Classroom (plus Annex) (30, 15)
1 Physical Anthropology Lab (24)
1 Ethnographic Anthropology Lab (24)
3 Small Classrooms (30, 30, 30)
Please see the attached layouts which are very close to final. Department storage/file space will be very similar to the new Science Building.
Full name - Behavioral and Social Science
Abbreviation - BSS